My Moly is under a 125 AMP breaker as well and I too used #2 wire for the hookup. I used some #4 in the panel with the SCR and the relays. I got to the 125 breaker factoring a 1.25 safety factor. I recall I was pulling about 93-94 AMP. All the wiring from the transformer to the element banks is 350mm stranded annealed copper.
__________________
Where are we going and why am I in this basket?
|